Planning and Building Control Performance

The Planning and Building Control Directorate update the follow information on a regular basis in order to demonstrate the volume of positive applications that are expediently determined by the Directorate.

Planning Statistics
In last 12 months – November 2016 to October 2017 inclusive (previous 12 months period in brackets)
1,384 Planning Applications were determined (1,309)
91% / 1,253 applications were approved - (94% / 1,224)
6% / 89 refused (4% / 57)
59% / 812 applications determined within 8 weeks (67% / 875)
81% / 1118 applications determined within 13 weeks (88% / 1,154)

-

Building control Statistics
In last 12 months – November 2016 to October 2017 inclusive (previous 12 month period in brackets) for the whole of the island outside of Douglas and Onchan
601 Building Control Applications were received (578)
592 commencements were logged (530)
810 completion certificates were issued (520)
5,030 site inspections were made (4,595)

No. of planning applications determined within 8 weeks

Percentage of planning applications determined within 8 weeks

No. of planning applications determined within 13 weeks

Percentage of planning applications determined within 13 weeks