The Planning and Building Control Directorate update the follow information on a regular basis in order to demonstrate the volume of positive applications that are expediently determined by the Directorate.

Planning Statistics

In last 12 months - March 2016 to February 2017 inclusive (previous 12 months period in brackets)

1,362 Planning Applications were determined (1,389)
91% / 1,245 applications were approved - (94% / 1,301)
6% / 78 refused (4% / 62)
59% / 800 applications determined within 8 weeks (79% / 1,102)
83% / 1,131 applications determined within 13 weeks (90% / 1,254)
Building controlĀ Statistics
In last 12 months - March 2016 to February 2017 inclusive (previous 12 month period in brackets) for the whole of the island outside of Douglas and Onchan
582 Building Control Applications were received (545)
541 commencements were logged (529)
505 completion certificates were issued (612)
4,694 site inspections were made (5,074)

Planning applications determined within 8 weeks 2016

Planning applications determined within 13 weeks 2016

Percentage of planning applications determined within 8 weeks

Percentage of planning applications determined within 13 weeks