The Planning and Building Control Directorate update the follow information on a regular basis in order to demonstrate the volume of positive applications that are expediently determined by the Directorate.

Planning Statistics

In last 12 months – June 2016 to May 2017 inclusive (previous 12 months period in brackets)

1,402 Planning Applications were determined (1,344)
91% / 1,277 applications were approved - (94% / 1,269)
6% / 87 refused (3% / 46)
59% / 824 applications determined within 8 weeks (76% / 1,027)
81% / 1,140 applications determined within 13 weeks (91% / 1,223)

-

Building control Statistics
In last 12 months – June 2016 to May 2017 inclusive (previous 12 month period in brackets) for the whole of the island outside of Douglas and Onchan
565 Building Control Applications were received (588)
528 commencements were logged (532)
519 completion certificates were issued (603)
4,698 site inspections were made (4,912)

Planning applications determined within 8 weeks 2016

Planning applications determined within 13 weeks 2016

Percentage of planning applications determined within 8 weeks

Percentage of planning applications determined within 13 weeks

Did you find what you were looking for?
Back to top