Planning and Building Control Performance

The Planning and Building Control Directorate update the follow information on a regular basis in order to demonstrate the volume of positive applications that are expediently determined by the Directorate.

Planning Statistics

In last 12 months – August 2016 to July 2017 inclusive (previous 12 months period in brackets)

1,422 Planning Applications were determined (1,335)
91% / 1,297 applications were approved - (93% / 1,246)
6% / 85 refused (4% / 56)
56% / 802 applications determined within 8 weeks (73% / 974)
81% / 1,145 applications determined within 13 weeks (89% / 1,193)

-

Building control Statistics
In last 12 months – August 2016 to July 2017 inclusive (previous 12 month period in brackets) for the whole of the island outside of Douglas and Onchan
589 Building Control Applications were received (588)
515 commencements were logged (515)
600 completion certificates were issued (574)
4,669 site inspections were made (4,753)

No. of planning applications determined within 8 weeks

No. of planning applications determined within 13 weeks

Percentage of planning applications determined within 8 weeks

Percentage of planning applications determined within 13 weeks